Injection Molding Automotive Headlight Structural Housing PP ABS Molded Part for OEM Lighting Assembly
Precision injection-molded PP/ABS headlight housings with molded-in bosses and sealing grooves held to ±0.05mm. SPI textures, chrome bezel optional, P20/718H/S136 tooling. MOQ 1 piece, DFM within one day, 7-10 day production.
automotive headlight housing molding
,pp abs structural housing
,headlight housing injection molding
The structural housing is the backbone of the lamp assembly. It carries the reflector, the lens and the adjuster, holds the sealing groove true, and withstands the heat the bulb generates. Molded in PP or ABS to your own STEP file, with mounting bosses, wire clips and vent seats built in rather than added later.
Gate and cooling are laid out so the groove face stays flat; otherwise the lamp fogs on the first rain test.
Radiused roots, drafted walls and rib thickness held under 60 percent of the nominal wall, so screws torque without splitting.
Groove and lens seat held to the drawing, so the lens presses home without a fight on the line.
Mounting tabs and adjuster seats sized against your load case, validated on the first article before tool sign-off.
| Part name | Automotive headlight structural housing |
| Process | Injection molding, new steel tool |
| Material | PP or ABS, black standard, matched to your sample |
| Colour | Black standard, matched to your sample or Pantone |
| Mould steel | P20 standard, 718H or S136 for long programmes |
| Tolerance | ±0.05 mm on critical features, per drawing |
| Surface | SPI texture, matte, black gloss, chrome bezel assembly optional |
| Minimum order | 1 piece, no minimum quantity |
| Price | USD 5 to 150 per piece, tooling cost quoted separately |
| Payment | Bank transfer, T/T, 50 percent deposit, balance before shipment |
| File formats | STEP, IGS, X_T, STL, DWG, PDF |
Counted from drawing confirmation and receipt of deposit.
| Stage | Duration |
|---|---|
| Tool design and steel cutting | 25 to 30 working days |
| T1 samples and dimensional report | 3 to 5 working days |
| Production run | 7 to 10 working days after sample approval |
- 1 Send the housing STEP file, the resin you want and the lamp model it fits.
- 2 We return a DFM note on draft, wall and boss design, with tooling and part price, within one working day.
- 3 Deposit by bank transfer, mould design signed off, steel cut.
- 4 T1 housings with a dimensional report for your fit check, production after approval.
Housings are bagged individually to protect the sealing face, counted into export cartons with your label and palletised. Moulds ship in a wooden case with a spare-part kit, cooling circuit diagram and maintenance sheet.
We will come back with a tooling price, a part price and a DFM note for your headlight structural housing within one working day.